Extron-electronics TLP 710CV User Guide Uživatelský manuál Strana 12

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 50
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 11
Tools Required for Installation
The following tools are required but not supplied:
Safety Glasses
Phillips Screw Driver
Tape Measure
1/4" Hex Nut Driver
Marking Pen
Square
Vacuum Cleaner
Included Parts
Open the shipping container and verify that all the components are present:
Table Clamps
Extron
Removal Tool
Zip Ties
#4−40 Screws
and Nuts
TLP 710CV
AC Power Module
1
Blank AAPs
Pass-thru AAPs
2 Pos
AAP Shelf Bracket Kits
(2 brackets/kit)
2
3 Pos1 Pos
PWR LAN OUT LAN-IN
AMBER
GREEN
BLINK
POWER ON
POWER ACTIVE
LOAD ERROR
Power over
Ethernet (PoE)
Injector
Extron
Extron
With Power Module Without Power Module
AC Power Module
1
1 0
Pass-through AAPs
2,3
3 3
Blank AAPs 6 6
1 space Bracket Kit 0 1
4
2 space Bracket Kit 3 4
3 space Bracket Kit 1 1
NOTES:
1
Outside the US, see the Extron website to purchase a power module that is
suitable for your location.
2
Each AAP Bracket Kit consists of two brackets. The rear bracket is higher than
the front bracket and has two holes for screws.
3
Active or Passive AAPs are not provided and must be purchased separately (see
the Extron website).
4
Single-space brackets can only be installed in one location (see the note and
figure on page 9).
TLP 710CV • Mounting 6
Zobrazit stránku 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 49 50

Komentáře k této Příručce

Žádné komentáře