Extron-electronics System 5 IP Series User Guide Uživatelský manuál Strana 55

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 126
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 54
4-19System 5 IP • Software- and Web Page-based Setup and Control
PRELIMINARY
Monitor
A typical GlobalViewer Monitor page
The Monitor window on the right side of the screen displays information on
what things (projector disconnection, lamp hours, and the like) are being
monitored, under what conditions, and whom will receive an e-mail notification
about each condition. This information appears only if the System 5 IP has been
configured to monitor such conditions.
Schedule
A typical GlobalViewer Schedule page
The Schedule window on the right side of the screen displays and allows you to
change (if logged in as an administrator) the times the projector or panel display
is automatically powered down each day, and also the times when the switcher’s
front panel controls are locked and unlocked.
Zobrazit stránku 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 125 126

Komentáře k této Příručce

Žádné komentáře